International Bridge Bus (2004? - present)
International Bridge Bus (2004? - 19 March 2020)
Was still operating in 2019 but was discontinued early in the COVID-19 pandemic.
Copyright ©1989-2017 David A. Wyatt. All Rights Reserved.
Copyright ©1989-2023 David A. Wyatt. All Rights Reserved.
Réseau express métropolitain (31 August 2023 - present)
Automated light metro system serving Brossard, greater Montréal, and Deux-Montagnes. Initial segment between Brossard and downtown Montréal opened 31 August 2023.
Constructed and operated by
CDPQ Infra, a subsidiary of
Caisse de dépôt et placement du Québec (CDPQ).
(See Montréal for the REM system as a whole.)
Copyright ©1989-2015 David A. Wyatt. All Rights Reserved.
Copyright ©1989-2023 David A. Wyatt. All Rights Reserved.
Réseau express métropolitain (31 August 2023 - present)
Automated light metro system serving greater Montréal, Brossard on the south shore, and Deux-Montagnes. Initial segment between downtown Montréal and Brossard opened 31 August 2023. Branches serving the west island of Montréal and Deux-Montagnes expected to open in 2024, followed by a branch to Pierre-Elliot-Trudeau airport in Dorval in 2027.
Constructed and operated by
CDPQ Infra, a subsidiary of
Caisse de dépôt et placement du Québec (CDPQ).
Light metro first segment to open 2023
Huron Shores Area Transit (04 August 2020 - present)
Rural inter-town transit serving Lambton Shores, South Huron, Bluewater, North Middlesex, and Kettle & Stony Point First Nation, with connections to
London,
Sarnia,
Strathroy, and
Goderich.
Operated under contract by
Voyago.
website.
Copyright ©1989-2020 David A. Wyatt. All Rights Reserved.
Copyright ©1989-2023 David A. Wyatt. All Rights Reserved.